Facebook Data Center (PRN3)

Among Pence/Kelly’s largest projects, the third data center in Prineville for social media company, Facebook, was a 600,000 square foot project requiring more than 20,000 cubic yards of concrete. The LEED-NC Gold Certified campus is the third of Facebook’s Prineville buildings, which has grown considerably since this was completed in 2017.

Read More

McNary High School

Pence Construction added 42,000 square feet to the largest high school in Salem Keizer School District. The two story, slab-on-grade tilt project completed in August of 2020.

Read More

Woodlark Hotel

Project Description Pence Kelly completed this seismic upgrade project at the Woodlark Hotel for LCG Pence Construction. It involved the tying together of 2 existing 100 year old buildings in downtown Portland and then structurally reinforcing them to code.  This included constructing two elevator cores in very tight spaces. Mike Collum and John Stewart were…

Read More

PDX – QTA

Project Description The Pence/Kelly PDX-QTA project for Hoffman Construction Company and owner, Port of Portland completed in 15 months of construction. This two-level parking structure sits adjacent to PDX P-2 Parking Garage. QTA stands for Quick Turn Around. Rental cars are returned on the ground level then go through an expedited process of cleaning and…

Read More

Mennonite Village

Project Description Mennonite Home is part of the Mennonite Village Campus in Albany, Oregon and home to hundreds of senior citizens. Pence Kelly performed work for a large-scale memory care addition there that involved removal of the north wing and construction of a brand new 4-level, 57,633 square foot replacement structure. The project included a…

Read More

DHS Corvallis

Project Description With much momentum and expertise, Pence Kelly completed the DHS Corvallis project in 4 months. Nat Taylor and Scott Butler were both Project Managers on this job while Brad Hays was the Project Engineer and Steve Taylor was the Superintendent. The DHS Corvallis project was a 50,000 SQF 1-level tilt up concrete office…

Read More

MaPS

Project Description Our team provided design and constructability assistance to help devise a successful plan for erecting this 44,000 SF, mid-rise office building on a historic riverbed site. Full-height articulated pre-cast concrete panels required added attention to be set in place, and created a cost-effective solution that made the project viable for the owner. An…

Read More

McMinnville High School

Project Description The McMinnville High School Addition occupies over 65,000 square feet, incorporating a new classroom wing and cafeteria. The project utilized 51 architecturally finished tilt panels with 16,000 square feet of custom colored brick veneer to match existing brick walls.

Read More

Beaverton K-8

Project Description This project added a new, 100,000 square foot, K-8 school to the Beaverton School District. Large, two-story tilt panels were used for the gymnasium.

Read More

Central High School

Project Description This LEED Gold project adds a new two-story classroom wing and theater with commons, giving the face of the campus an entirely new, updated look.

Read More

Silverton High School

Project Description This project included extensive forming for the new state-of-the-art auditorium, including cast-in-place radius walls, structural deck and theater seating.

Read More

Kettle Foods

Project Description This is Kettle Foods’ manufacturing plant in Salem, Oregon. The 61,690 square foot cast-in-place plant with tilt-up walls was completed in 1999 and houses more than 180 employees. It produces approximately half of the nation’s supply of Kettle Brand products.

Read More

Widmer

Project Description This renovation and addition consisted of 66,000 square feet of offices and insulated storage and production areas while the 52,000 square foot expansion houses refrigerated processing. The scope of work included the demolition of existing buildings adjacent to an operational building, excavation of the site for a new basement, construction of a new…

Read More

Cascade Steel Rolling Mill

Project Description We have been privileged to provide services for CSRM on several occasions. This project for Cascade Steel Rolling Mill features a 19,000 SF tilt-up locker room addition in McMinnville, Oregon.

Read More

Hyundai

Project Description Hyundai CUB was a 191,362 square foot support facility for the Hyundai fabrication plant in Eugene, Oregon. Our 2.3 million dollar contract was with Meisner Wurst and Marshall. The structure included cast-in-place basement walls and slab-on-metal deck.

Read More

Genentech

Project Description This highly complex project in Hillsboro for the biotech company Genentech, featured over 180,000 square feet of SOG, 124,000 of SOMD, 6,000 CY of footings, 500 CY of walls, as well as elevators and dock pits.

Read More

Salem Hospital Parking Structure

Project Description Pence/Kelly constructed the 550-car parking structure across from the Center for Outpatient Medicine. It is connected to the Center as well as the hospital by two Skybridges. In time, Salem Hospital’s parking needs increased significantly. We added two additional levels (250-car capacity) and a heli-stop. This addition required structural upgrades to compensate for…

Read More

Food Service America

Project Description Our work with Food Services of America involved the remodel of a 350,000 square foot refrigerated distribution center. Included in the renovation are 35,000 square feet of new office space, 44 additional dock doors, and an additional vehicle maintenance building. Extensive shoring had to be performed to the outside shell in order to…

Read More

NIKE Office Building

Project Description This three level, 82,000 square foot, office building was constructed on the Nike Campus in Beaverton, Oregon. This 2 million dollar contract required an intense field of pile caps and grade beams to support the three levels of post-tension slabs.

Read More

North Mall Office Building

Project Description The North Mall Office was the “Pilot Project” under the Executive Order on Sustainability established by former Governor John Kitzhaber. The three story office building is 115,000 square feet with a 64,000 square foot, 180 space parking structure. This structure is all cast-in-place concrete with post tensioned slabs. The main shear walls were…

Read More

Salem Convention Center

Project Description The Salem Convention Center is a full city block of structural concrete in downtown Salem. The 102,000 square foot footprint consists of one level of below grade parking with a post-tensioned concrete slab above. The West half of the block is a three-story conference center with the East side being a hotel. 40-foot…

Read More

295 Church

Project Description This cooperative project brought together Willamette University, the City of Salem and a sampling of other local businesses to create an upscale retail and residential project in downtown Salem, Oregon. 295 Church Street is a five-level mixed-use post-tensioned and precast concrete project that was completed in February 2009.

Read More

Pacifica

Project Description The Pacifica project was new construction of an 8-story mixed-use condominium tower in Portland, Oregon in a half-mile riverfront community bordering the Willamette River. The new post-tensioned concrete tower provides 74 high-end condominium units, ground floor retail and underground parking.

Read More

OSU Library

Project Description Built in Corvallis, Oregon and working with the general contractor, Hoffman Construction, the Oregon State University Library was a six-level, 3.8 million dollar contract for a cast-in-place concrete structure. Extensive shear walls and mild steel reinforced slabs make up the structure.

Read More

University of Oregon Global Scholars Hall

Project Description This 459 bed student housing building on the U of O campus was a Hoffman Construction job. With nearly 200,000 square feet, the building offers students a unique learning environment with a variety of spaces throughout. In addition to living space, the hall is home to a café, multi-use performance space, classrooms and…

Read More

OHSU Building

Project Description Pence/Kelly Concrete completed this 11 month, 5.5 million dollar concrete package ahead of the scheduled completion date and achieved our goal of zero time-loss injuries. The project involved construction of a new 11 story 260,000 square foot structural steel and concrete building. The structure includes five basement levels and two free-standing concrete shear…

Read More

First + Main

Project Description Pence/Kelly’s contract with Hoffman for this project included over 350,000 square feet of slab-on-metal-deck, extensive curbs, stem walls and embeds. Additionally, the fourth floor landscaped roof required architecturally finished radius walls. Due to the waterproofing system in this location, an irregular forming system was utilized to ensure no penetrations through the waterproof membrane.

Read More