Posts by P/K
Woodlark Hotel
Project Description Pence Kelly completed this seismic upgrade project at the Woodlark Hotel for LCG Pence Construction. It involved the tying together of 2 existing 100 year old buildings in downtown Portland and then structurally reinforcing them to code. This included constructing two elevator cores in very tight spaces. Mike Collum and John Stewart were…
Read MorePDX – QTA
Project Description The Pence/Kelly PDX-QTA project for Hoffman Construction Company and owner, Port of Portland completed in 15 months of construction. This two-level parking structure sits adjacent to PDX P-2 Parking Garage. QTA stands for Quick Turn Around. Rental cars are returned on the ground level then go through an expedited process of cleaning and…
Read MoreMennonite Village
Project Description Mennonite Home is part of the Mennonite Village Campus in Albany, Oregon and home to hundreds of senior citizens. Pence Kelly performed work for a large-scale memory care addition there that involved removal of the north wing and construction of a brand new 4-level, 57,633 square foot replacement structure. The project included a…
Read MoreDHS Corvallis
Project Description With much momentum and expertise, Pence Kelly completed the DHS Corvallis project in 4 months. Nat Taylor and Scott Butler were both Project Managers on this job while Brad Hays was the Project Engineer and Steve Taylor was the Superintendent. The DHS Corvallis project was a 50,000 SQF 1-level tilt up concrete office…
Read MoreOSU North Entry
Project Description Coming soon.
Read MoreMaPS
Project Description Our team provided design and constructability assistance to help devise a successful plan for erecting this 44,000 SF, mid-rise office building on a historic riverbed site. Full-height articulated pre-cast concrete panels required added attention to be set in place, and created a cost-effective solution that made the project viable for the owner. An…
Read MoreMcMinnville High School
Project Description The McMinnville High School Addition occupies over 65,000 square feet, incorporating a new classroom wing and cafeteria. The project utilized 51 architecturally finished tilt panels with 16,000 square feet of custom colored brick veneer to match existing brick walls.
Read MoreBeaverton K-8
Project Description This project added a new, 100,000 square foot, K-8 school to the Beaverton School District. Large, two-story tilt panels were used for the gymnasium.
Read MoreCentral High School
Project Description This LEED Gold project adds a new two-story classroom wing and theater with commons, giving the face of the campus an entirely new, updated look.
Read MoreSilverton High School
Project Description This project included extensive forming for the new state-of-the-art auditorium, including cast-in-place radius walls, structural deck and theater seating.
Read MoreKettle Foods
Project Description This is Kettle Foods’ manufacturing plant in Salem, Oregon. The 61,690 square foot cast-in-place plant with tilt-up walls was completed in 1999 and houses more than 180 employees. It produces approximately half of the nation’s supply of Kettle Brand products.
Read MoreWidmer
Project Description This renovation and addition consisted of 66,000 square feet of offices and insulated storage and production areas while the 52,000 square foot expansion houses refrigerated processing. The scope of work included the demolition of existing buildings adjacent to an operational building, excavation of the site for a new basement, construction of a new…
Read MoreCascade Steel Rolling Mill
Project Description We have been privileged to provide services for CSRM on several occasions. This project for Cascade Steel Rolling Mill features a 19,000 SF tilt-up locker room addition in McMinnville, Oregon.
Read MoreHyundai
Project Description Hyundai CUB was a 191,362 square foot support facility for the Hyundai fabrication plant in Eugene, Oregon. Our 2.3 million dollar contract was with Meisner Wurst and Marshall. The structure included cast-in-place basement walls and slab-on-metal deck.
Read MoreGenentech
Project Description This highly complex project in Hillsboro for the biotech company Genentech, featured over 180,000 square feet of SOG, 124,000 of SOMD, 6,000 CY of footings, 500 CY of walls, as well as elevators and dock pits.
Read MoreSalem Hospital Parking Structure
Project Description Pence/Kelly constructed the 550-car parking structure across from the Center for Outpatient Medicine. It is connected to the Center as well as the hospital by two Skybridges. In time, Salem Hospital’s parking needs increased significantly. We added two additional levels (250-car capacity) and a heli-stop. This addition required structural upgrades to compensate for…
Read MoreFood Service America
Project Description Our work with Food Services of America involved the remodel of a 350,000 square foot refrigerated distribution center. Included in the renovation are 35,000 square feet of new office space, 44 additional dock doors, and an additional vehicle maintenance building. Extensive shoring had to be performed to the outside shell in order to…
Read MoreNIKE Office Building
Project Description This three level, 82,000 square foot, office building was constructed on the Nike Campus in Beaverton, Oregon. This 2 million dollar contract required an intense field of pile caps and grade beams to support the three levels of post-tension slabs.
Read MoreNorth Mall Office Building
Project Description The North Mall Office was the “Pilot Project” under the Executive Order on Sustainability established by former Governor John Kitzhaber. The three story office building is 115,000 square feet with a 64,000 square foot, 180 space parking structure. This structure is all cast-in-place concrete with post tensioned slabs. The main shear walls were…
Read MoreSalem Convention Center
Project Description The Salem Convention Center is a full city block of structural concrete in downtown Salem. The 102,000 square foot footprint consists of one level of below grade parking with a post-tensioned concrete slab above. The West half of the block is a three-story conference center with the East side being a hotel. 40-foot…
Read More295 Church
Project Description This cooperative project brought together Willamette University, the City of Salem and a sampling of other local businesses to create an upscale retail and residential project in downtown Salem, Oregon. 295 Church Street is a five-level mixed-use post-tensioned and precast concrete project that was completed in February 2009.
Read MorePacifica
Project Description The Pacifica project was new construction of an 8-story mixed-use condominium tower in Portland, Oregon in a half-mile riverfront community bordering the Willamette River. The new post-tensioned concrete tower provides 74 high-end condominium units, ground floor retail and underground parking.
Read MoreOSU Library
Project Description Built in Corvallis, Oregon and working with the general contractor, Hoffman Construction, the Oregon State University Library was a six-level, 3.8 million dollar contract for a cast-in-place concrete structure. Extensive shear walls and mild steel reinforced slabs make up the structure.
Read MoreUniversity of Oregon Global Scholars Hall
Project Description This 459 bed student housing building on the U of O campus was a Hoffman Construction job. With nearly 200,000 square feet, the building offers students a unique learning environment with a variety of spaces throughout. In addition to living space, the hall is home to a café, multi-use performance space, classrooms and…
Read MoreOHSU Building
Project Description Pence/Kelly Concrete completed this 11 month, 5.5 million dollar concrete package ahead of the scheduled completion date and achieved our goal of zero time-loss injuries. The project involved construction of a new 11 story 260,000 square foot structural steel and concrete building. The structure includes five basement levels and two free-standing concrete shear…
Read MoreU of O – M. Knight Arena
Project Description Pence/Kelly poured over 30,000 cubic yards of concrete for this project and met the condensed schedule for our primary contractor, Hoffman Construction.
Read MoreFirst + Main
Project Description Pence/Kelly’s contract with Hoffman for this project included over 350,000 square feet of slab-on-metal-deck, extensive curbs, stem walls and embeds. Additionally, the fourth floor landscaped roof required architecturally finished radius walls. Due to the waterproofing system in this location, an irregular forming system was utilized to ensure no penetrations through the waterproof membrane.
Read More