The two-story, 45,000 SF cleanroom project started out with doing Pile Caps, then pour slabs over the caps. A unique aspect of the project was at the upper level, the SOMD was done with only lightweight concrete.

Project
Details

City: Beaverton

State: OR

Size SF: 45,000

Yards of Concrete:1,336 CY

Completion Date: April 2021, 2023

General Contractor: MWH Contractors

Architect: Mackanzie