Data Center
Data Center Cleanroom
The two-story, 45,000 SF cleanroom project started out with doing Pile Caps, then pour slabs over the caps. A unique aspect of the project was at the upper level, the SOMD was done with only lightweight concrete. Project Details City: Beaverton State: OR Size SF: 45,000 Yards of Concrete:1,336 CY Completion Date: April 2021, 2023…
Read MorePrineville Data Center 1 & 2
This two-story, 2-building complex is comprised of one 200,000 SF data hall connected by a 30,000 SF administrative building. The data hall was built with 3 levels of concrete slabs: an elevated slab on metal deck roof, a slab on metal deck 2nd story, and a ground level slab on grade. To finish operations for…
Read MoreHillsboro Data Center
Located in Hillsboro, this 568,000 SF, two level, commercial data center is enclosed by precast. This commercial data center allows multiple companies to securely store their data, differing from industrial data centers where a company stores their own data. Project Details City: Hillsboro State: OR Size SF: 568,000 Yards of Concrete: 40,256 CY Completion Date:…
Read MorePrineville Data Center 3
Among Pence/Kelly’s largest projects, the third data center in Prineville was a 600,000 square foot project requiring more than 20,000 cubic yards of concrete. The LEED-NC Gold Certified campus is the third building, which has grown considerably since this was completed in 2017.
Read More