Sitework for this social health facility included a comprehensive package of structural and accessibility elements to support long-term public service operations. The scope featured sidewalks, ADA-compliant ramps, driveways, curbs, and paved walkways designed to ensure smooth circulation across the site. We also installed light pole bases for exterior lighting, trench drains for effective stormwater management, and concrete pads for switchgear and generator equipment. Decorative concrete features were integrated into the hardscape design to enhance the facility’s public-facing aesthetic.
Project
Details
City: Vancouver
State: WA
Yards of Concrete: 998 CY
Completion Date: January 2025
General Contractor: Hoffman Construction Company
Architect: BCRA Architects