Project Description

Our team provided design and constructability assistance to help devise a successful plan for erecting this 44,000 SF, mid-rise office building on a historic riverbed site. Full-height articulated pre-cast concrete panels required added attention to be set in place, and created a cost-effective solution that made the project viable for the owner. An architectural exterior feature included inset bricks into the site-cast concrete exterior panels.

Project Description

The McMinnville High School Addition occupies over 65,000 square feet, incorporating a new classroom wing and cafeteria. The project utilized 51 architecturally finished tilt panels with 16,000 square feet of custom colored brick veneer to match existing brick walls.

Project Description

This is Kettle Foods’ manufacturing plant in Salem, Oregon. The 61,690 square foot cast-in-place plant with tilt-up walls was completed in 1999 and houses more than 180 employees. It produces approximately half of the nation’s supply of Kettle Brand products.

This renovation and addition consisted of 66,000 square feet of offices and insulated storage and production areas while the 52,000 square foot expansion houses refrigerated processing. The scope of work included the demolition of existing buildings adjacent to an operational building, excavation of the site for a new basement, construction of a new two-story addition to house cold bottle storage, beer fermentation operations, keg filling station, offices, and tasting room.

The Widmer Brothers Brewery was designated the Top Industrial Project of 2007 by Northwest Construction Magazine.

Project Description

We have been privileged to provide services for CSRM on several occasions. This project for Cascade Steel Rolling Mill features a 19,000 SF tilt-up locker room addition in McMinnville, Oregon.

Project Description

Hyundai CUB was a 191,362 square foot support facility for the Hyundai fabrication plant in Eugene, Oregon. Our 2.3 million dollar contract was with Meisner Wurst and Marshall. The structure included cast-in-place basement walls and slab-on-metal deck.

Project Description

This highly complex project in Hillsboro for the biotech company Genentech, featured over 180,000 square feet of SOG, 124,000 of SOMD, 6,000 CY of footings, 500 CY of walls, as well as elevators and dock pits.

Project Description

Pence/Kelly constructed the 550-car parking structure across from the Center for Outpatient Medicine. It is connected to the Center as well as the hospital by two Skybridges. In time, Salem Hospital’s parking needs increased significantly. We added two additional levels (250-car capacity) and a heli-stop. This addition required structural upgrades to compensate for additional weight and height. There are 9,000 cubic yards of concrete in this cast-in-place structure.

Project Description

Our work with Food Services of America involved the remodel of a 350,000 square foot refrigerated distribution center. Included in the renovation are 35,000 square feet of new office space, 44 additional dock doors, and an additional vehicle maintenance building. Extensive shoring had to be performed to the outside shell in order to accommodate the new loading docks.

Project Description

This three level, 82,000 square foot, office building was constructed on the Nike Campus in Beaverton, Oregon. This 2 million dollar contract required an intense field of pile caps and grade beams to support the three levels of post-tension slabs.

Project Description

The North Mall Office was the “Pilot Project” under the Executive Order on Sustainability established by former Governor John Kitzhaber. The three story office building is 115,000 square feet with a 64,000 square foot, 180 space parking structure. This structure is all cast-in-place concrete with post tensioned slabs. The main shear walls were cast as architectural colored concrete and all other concrete is exposed to the eye.

Project Description

The Salem Convention Center is a full city block of structural concrete in downtown Salem. The 102,000 square foot footprint consists of one level of below grade parking with a post-tensioned concrete slab above. The West half of the block is a three-story conference center with the East side being a hotel. 40-foot high, 32-inch thick, architectural concrete shear walls rise from the ground floor PT slab to the third floor above. The schedule was aggressive as the City of Salem planned a New Years Eve gala at the center to ring in 2005.

Project Description

This cooperative project brought together Willamette University, the City of Salem and a sampling of other local businesses to create an upscale retail and residential project in downtown Salem, Oregon. 295 Church Street is a five-level mixed-use post-tensioned and precast concrete project that was completed in February 2009.

The Pacifica project was new construction of an 8-story mixed-use condominium tower in Portland, Oregon in a half-mile riverfront community bordering the Willamette River. The new post-tensioned concrete tower provides 74 high-end condominium units, ground floor retail and underground parking.

Project Description

Built in Corvallis, Oregon and working with the general contractor, Hoffman Construction, the Oregon State University Library was a six-level, 3.8 million dollar contract for a cast-in-place concrete structure. Extensive shear walls and mild steel reinforced slabs make up the structure.

Project Description

This 459 bed student housing building on the U of O campus was a Hoffman Construction job. With nearly 200,000 square feet, the building offers students a unique learning environment with a variety of spaces throughout. In addition to living space, the hall is home to a café, multi-use performance space, classrooms and a theater for lectures.